Beer Pong

Beer Pong

Shellstage
08/09/2018
  • Mature 17+

  • 4.1 and up

    Android OS

Acerca del Beer Pong

Play your favorite beer pong game anywhere, and anytime you want!

Enjoy your favorite beer pong game anytime or anywhere you want and it's all free!

Features:

1. 2 Beer pong Game mode (Causal, Color)

2. All by your lonesome? Compete with a computer or with your friends (maximum of 2 players per device).

Beer pong rules differs on every house or party events but here’s the rules for this beer pong game.

Interaction Instructions

1. Tap to stop shot selection. Shot selection can be cancelled but be aware from the shot clock. Each player is given 10 seconds to aim.

2. For color mode: A player’s assigned color is signified by the color of the ball or the color of the ‘aim ball’. The aim ball is the circular shape under the end of the arc of your shot selection.

Base Game Instructions

1. A player will be randomly selected to throw the ball first at the start of the game.

2. If the player successfully put the ball into the cup. It will signify as a goal and the player will retain his possession until he misses or cleared all of his cups. The goaled cup is to be removed out of the play.

3. If the player cleared all of his cups, the game will enter rebuttal or redemption phase. On this phase, the opposing player will have the chance to clear all of his cups. If the player misses, the player who first cleared his cups or the player who triggered the rebuttal phase wins. However, if the rebutall-ing player successfully cleared all of his cups. The game will enter overtime phase. During this phase, the cups will be reduced to half. This rule applies also during the overtime period. Both sides have an unlimited amount of rebuttals during overtime until one party has missed.

4. Each player has an opportunity to re-rack (reposition to a triangular formation) when their cup count is at 6-3-1.

5. Bounce shot will amount to two cups cleared.

Color Mode Guide

1. The player must hit the cup with his assigned color. A player’s assigned color is signified by the color of the ball or the color of the ‘aim ball’. The aim ball is the circular shape under the end of the arc of your shot selection.

2. If the player hit a cup that doesn’t belong to him. It will be against him and will be marked as a score/cleared cup for his opponent.

3. Bounce shot still applies and two cups of the same color will be cleared/ removed from play.

Aiming Tip:

Make sure that the cup is between endpoint of the ark and the aim ball for better shot result.

Feel free to comment and rate for further feedback to improve the game experience!

Mostrar más

Novedades más recientes 0.2

Last updated on 08/09/2018
Minor bug fixes and improvements. Install or update to the newest version to check it out!
Mostrar más

Jugabilidad y capturas de pantalla

  • Beer Pong para Trailer oficial Android
  • Beer Pong captura de pantalla 1
  • Beer Pong captura de pantalla 2
  • Beer Pong captura de pantalla 3
  • Beer Pong captura de pantalla 4

Información de Beer Pong APK

Última Versión
0.2
Categoría
Arcade
Android OS
4.1 and up+
Desarrollador
Shellstage
Clasificación de contenido
Mature 17+ · Use of Alcohol
Descargas seguras y rápidas de APK en APKPure
APKPure utiliza verificación de firmas para garantizar descargas de Beer Pong APK libres de virus para ti.
APKPure icono

Descarga la aplicación APKPure para obtener más recompensas y descuentos en juegos

¡Un clic para instalar archivos XAPK/APK en Android!

Descargar APKPure
thank icon
We use cookies and other technologies on this website to enhance your user experience.
By clicking any link on this page you are giving your consent to our Privacy Policy and Cookies Policy.
Learn More about Policies