Flyover Design
關於Flyover Design
選擇天橋和最優質的
The elevated bridge is a construction or building that serves to connect two parts of the road that are cut off by the obstacles such as deep valleys, river channels, lakes, irrigation channels, railways, highways that are not even a plane even the ocean.
Cast casting process using pre-stacked concrete begins with preparing a rough aggregate first. Next do the grouting / grout colodial work. Then the grout is mixed with sand, cement, and water to taste. Some also add additives such as plasticizer on a special stirrer.
Implementation of this method is very advantageous arabica casting process using a medium concrete mixture with an aggregate size of less than 40 mm. You can take advantage of additives that can increase the power of the concrete masonry mixture. The advantages of this casting technique by pumping, among others, can save the project cost budget plan (RAB), the need for a small workforce, the results are directly proportional to the initial preparation, and the level of productivity of the work was easily increased by increasing the pump capacity and improve the quality of the results.
Thank you
最新版本2.9的更新日誌
Flyover Design APK信息
Flyover Design歷史版本
Flyover Design 2.9
Flyover Design 2.7
Flyover Design 2.5
Flyover Design 1.0
在APKPure極速安全下載應用程式
一鍵安裝安卓XAPK/APK文件!