• 73.0 MB

    فائل سائز

  • Android 4.3+

    Android OS

About Omega Linkr

Smartphone Control For Vehicles & More!

Linkr allows you to start, lock, unlock, activate trunk release, track, and more directly from your phone!

NOTE: An Omega Linkr system must be installed in your vehicle for this app to operate.

NOTE: Locations are sent by SMS message with a link to Google Maps.

Models:

LINKR-MOBILE-2G is an international (outside the USA) system that works on any GSM cellular network with a user supplied SIM card.

LINKR-M1 uses the Verizon network in the USA. Activations & subscriptions are available at www.OmegaLinkr.com.

Omega Linkr is a smartphone interface that gives you control of vehicle convenience & security features from virtually anywhere in the world! This app can directly control Omega's Excalibur line of remote start/security systems & Omegalink vehicle specific remote start kits. It can also be hardwired directly to the vehicle.

Omega Linkr allows you to safely and securely remote start, lock / unlock, or open your car's trunk from virtually anywhere in the world.

Receive alerts and notifications if your vehicle is violated when installed with any compatible remote start / security system.

Main Features:

- Multi-user support

- Multi-device support

- Easy swipe between devices

- 6 languages supported: English, Spanish, French, Malay, Romanian, Serbian

- Heartbeat / Auto-track from once per 1-30 days

- Excessive speed alert w/ selectable threshold

- Low car battery alert

- 2 selectable Geo-fences w/ alerts

- Selectable device icon

- Selectable control screen skin

- Panic from button in car or from app

- Check SIM balance (outside the USA only)

- Eaves drop feature allows you to listen to the vehicle's interior (outside USA only).

Optional LINKR-MIC required.

- Lock control

- Unlock control

- Trunk release

- Start / Stop Engine (optional remote start system required)

- 2 Auxiliary functions

- Dedicated starter disable function

- Assign up to 5 alert receivers

مزید دکھائیںکم دکھائیں

What's new in the latest 2.71.0

Last updated on 2019-05-21
Fixed issue with SMS command when app is force closed.

APKPure ایپکےذریعےانتہائی تیزاورمحفوظڈاؤنلوڈنگ

Android پر XAPK/APK فائلیںانسٹالکرنےکےلیےایککلککریں!

ڈاؤن لوڈ کریں APKPure