UK Trains - Performance (PPM)

JDG Tech
Aug 30, 2022

UK Trains - Performance (PPM) 정보

승객 서비스로 광고되는 개별 열차의 성능을 측정합니다.

The public performance measure (PPM) measures the performance of individual trains advertised as passenger services against their planned timetable as agreed between the operator and Network Rail at 22:00 the night before. PPM is therefore the percentage of trains 'on time' compared to the total number of trains planned.

A train is defined as on time if it arrives at the destination within five minutes (ie 4 minutes 59 seconds or less) of the planned arrival time for London and South East or regional services, or 10 minutes (ie 9 minutes 59 seconds or less) for long distance services.

Where a train fails to run its entire planned route calling at all timetabled stations it will count as a PPM failure.

더 보기접기

What's new in the latest 5.0

Last updated on 2022-08-31
Dark Mode

UK Trains - Performance (PPM)의 오래된 버전

APKPure 앱을통한매우빠르고안전한다운로드

한번의클릭으로 Android에 XAPK/APK 파일을설치할수있습니다!

다운로드 APKPure