Real Drag Car Racing Sim
84.8 MB
Saiz Fail
EveryoneLearn More
Android 4.1+
Android OS
Mengenai Real Drag Car Racing Sim
NON-STOP DRAG CAR RACING Sim : Real Drag Car racing sim is a type of motor racing in which automobiles or motorcycles (usually specially prepared for the purpose) compete, usually two at a time, to be first to cross a set finish line. The race follows a short, straight course from a standing start over a measured distance, most commonly ¼ mile (1,320 ft (402 m)), with a shorter (1,000 ft (305 m)) becoming increasingly popular, as it has become the standard for Top Fuel dragsters and funny cars, where some major bracket races and other sanctioning bodies have adopted it as the standard, while the ⅛ mi (660 ft (201 m) is also popular in some circles. Electronic timing and speed sensing systems have been used to record race results since the 1960s.
Before each race (commonly known as a pass), each driver is allowed to perform a burnout, which heats the driving tires and lays rubber down at the beginning of the track, improving traction. Each driver then lines up (or stages) at the starting line, so are you ready for wheels burnout.
Modern professional races are started electronically by a system known as a Christmas tree.
Many type of cars can participate in this real drag car racing sim specially A typical Super Stock car ( Super stock classes are similar to street stock, but allow for more modifications to the engine. Power output is usually in the range of 500–550 horsepower (373– 410 kilowatts). Tire width is usually limited to 8 in (200 mm).
Sit on the driving seat and challenge your opponents and be a part INSANE drag races , show your dragster skills and try some best sleepers cars ever.
Drive your car modify it and achieve top speed to break fastest pass ever made in 'Street Legal'
Lets drive the Top Fuel Dragster cars on city streets do some wheels burnout and drive like champion driver.
Amazing sports car racing game , challenge opponent drivers and show your Driving skills
What's new in the latest 1.3
Maklumat APK Real Drag Car Racing Sim
Versi lama Real Drag Car Racing Sim
Real Drag Car Racing Sim 1.3
Muat turun Aplikasi APKPure untuk mendapatkan lebih banyak ganjaran permainan dan diskaun
Satu klik untuk memasang fail XAPK/APK pada Android!







