Real Drag Car Racing Sim

Real Drag Car Racing Sim

LinkedGeeks
2018年05月07日
  • 84.8 MB

    文件大小

  • EveryoneLearn More

  • Android 4.1+

    Android OS

關於Real Drag Car Racing Sim

NON-STOP DRAG CAR RACING Sim : Real Drag Car racing sim is a type of motor racing in which automobiles or motorcycles (usually specially prepared for the purpose) compete, usually two at a time, to be first to cross a set finish line. The race follows a short, straight course from a standing start over a measured distance, most commonly ¼ mile (1,320 ft (402 m)), with a shorter (1,000 ft (305 m)) becoming increasingly popular, as it has become the standard for Top Fuel dragsters and funny cars, where some major bracket races and other sanctioning bodies have adopted it as the standard, while the ⅛ mi (660 ft (201 m) is also popular in some circles. Electronic timing and speed sensing systems have been used to record race results since the 1960s.

Before each race (commonly known as a pass), each driver is allowed to perform a burnout, which heats the driving tires and lays rubber down at the beginning of the track, improving traction. Each driver then lines up (or stages) at the starting line, so are you ready for wheels burnout.

Modern professional races are started electronically by a system known as a Christmas tree.

Many type of cars can participate in this real drag car racing sim specially A typical Super Stock car ( Super stock classes are similar to street stock, but allow for more modifications to the engine. Power output is usually in the range of 500–550 horsepower (373– 410 kilowatts). Tire width is usually limited to 8 in (200 mm).

Sit on the driving seat and challenge your opponents and be a part INSANE drag races , show your dragster skills and try some best sleepers cars ever.

Drive your car modify it and achieve top speed to break fastest pass ever made in 'Street Legal'

Lets drive the Top Fuel Dragster cars on city streets do some wheels burnout and drive like champion driver.

Amazing sports car racing game , challenge opponent drivers and show your Driving skills

更多

最新版本1.3的更新日誌

Last updated on 2018年05月07日
camera view issue resolved
更多

遊戲玩法和屏幕截圖

  • Real Drag Car Racing Sim 海報
  • Real Drag Car Racing Sim 截圖 1
  • Real Drag Car Racing Sim 截圖 2
  • Real Drag Car Racing Sim 截圖 3
  • Real Drag Car Racing Sim 截圖 4
  • Real Drag Car Racing Sim 截圖 5
  • Real Drag Car Racing Sim 截圖 6
  • Real Drag Car Racing Sim 截圖 7

Real Drag Car Racing Sim APK信息

最新版本
1.3
Android OS
Android 4.1+
文件大小
84.8 MB
開發者
LinkedGeeks
內容分級
EveryoneLearn More · Everyone
在APKPure安全快速地下載APK
APKPure 使用簽章驗證功能,確保為您提供無病毒的 Real Drag Car Racing Sim APK 下載。

Real Drag Car Racing Sim歷史版本

Real Drag Car Racing Sim 1.3

84.8 MB2018年05月07日
下載
APKPure 圖標

下載APKPure客戶端,獲得更多遊戲獎勵和折扣

一鍵安裝安卓XAPK/APK文件!

下載 APKPure
thank icon
We use cookies and other technologies on this website to enhance your user experience.
By clicking any link on this page you are giving your consent to our Privacy Policy and Cookies Policy.
Learn More about Policies