Extreme Car Simulator 2020

Extreme Car Simulator 2020

er24application
Nov 6, 2019
  • 97.1 MB

    Rozmiar Pliku

  • Everyone

  • Android 4.1+

    Android OS

O Extreme Car Simulator 2020

Najlepszy najlepszy symulator jazdy samochodem do 2020 roku!Pobierz teraz fajną grę samochodową!

Extreme Car Simulator 2020 is a game with realistic physics.This game is best car driving simulator advanced real physics engine offers you have driving a realistic driving experience!

You can drive through city, car racing arena, airport, waterfront, mountains and long road through the trees.

If you like sports car simulator games then you can racing sports car for free!

Is this game Extreme Car Simulator 2020 perfect for you ,racing sports car for free!

You can drive in town with other car traffic or racing other rival vehicles, participants in addition to participate in five successive challenges and double your fun. It has enough ramps where you can driving with full speed and fly for a short time with car.

Extreme fun with driving vehicles waiting for you!

GAME FEATURE and HOW TO PLAY:

The game has one of the best graphics on Google Play Store!

In main menu you can choose if you want to drive in or out of town with or without cars you can choose if you want to start directly in the race arena!

There are 3 extreme cars to buy but there will be more to come soon!

In game there are 5 challenges there have to reach in a certain time checkpoint if they manage all in due time they receive as a reward coins!

With the speedometer you can see the speed of the car with the button with big pedal you can faster extreme car driving with other pedal button you can slow down with the car and with the R button the car drive backwards!

In the lower right you can steer the car with the arrow button.

In the lower left you can steer the car with the arrow button.

In the game you can change the view of the camera with a camera button. If the car turns around, you can restore the car to the right side by button.

Hopefully the game will be a lot of fun.

Have fun with Extreme Car Simulator 2020. You can download it for free now!

Pokaż więcej

What's new in the latest 1

Last updated on Nov 6, 2019
Minor bug fixes and improvements. Install or update to the newest version to check it out!
Pokaż więcej

Rozgrywka i zrzuty ekranu

  • Extreme Car Simulator 2020 plakat
  • Extreme Car Simulator 2020 screenshot 1
  • Extreme Car Simulator 2020 screenshot 2
  • Extreme Car Simulator 2020 screenshot 3
  • Extreme Car Simulator 2020 screenshot 4

Informacje Extreme Car Simulator 2020 APK

Ostatnia wersja
1
Kategoria
Wyścigi
Android OS
Android 4.1+
Rozmiar Pliku
97.1 MB
Ocena treści
Everyone
Bezpieczne i Szybkie Pobieranie APK na APKPure
APKPure używa weryfikacji podpisu, aby zapewnić bezpieczne pobieranie plików APK Extreme Car Simulator 2020 bez wirusów dla Ciebie

Stare wersje Extreme Car Simulator 2020

APKPure ikona

Pobierz aplikację APKPure, aby uzyskać więcej nagród i zniżek w grach

Jedno kliknięcie, aby zainstalować pliki XAPK/APK na Androidzie!

Pobierz APKPure
thank icon
We use cookies and other technologies on this website to enhance your user experience.
By clicking any link on this page you are giving your consent to our Privacy Policy and Cookies Policy.
Learn More about Policies