Extreme Car Simulator 2020

Extreme Car Simulator 2020

er24application
Nov 6, 2019
  • 97.1 MB

    File Size

  • Everyone

  • Android 4.1+

    Android OS

About Extreme Car Simulator 2020

The ultimate best car driving simulator of 2020!Download the cool car game now!

Extreme Car Simulator 2020 is a game with realistic physics.This game is best car driving simulator advanced real physics engine offers you have driving a realistic driving experience!

You can drive through city, car racing arena, airport, waterfront, mountains and long road through the trees.

If you like sports car simulator games then you can racing sports car for free!

Is this game Extreme Car Simulator 2020 perfect for you ,racing sports car for free!

You can drive in town with other car traffic or racing other rival vehicles, participants in addition to participate in five successive challenges and double your fun. It has enough ramps where you can driving with full speed and fly for a short time with car.

Extreme fun with driving vehicles waiting for you!

GAME FEATURE and HOW TO PLAY:

The game has one of the best graphics on Google Play Store!

In main menu you can choose if you want to drive in or out of town with or without cars you can choose if you want to start directly in the race arena!

There are 3 extreme cars to buy but there will be more to come soon!

In game there are 5 challenges there have to reach in a certain time checkpoint if they manage all in due time they receive as a reward coins!

With the speedometer you can see the speed of the car with the button with big pedal you can faster extreme car driving with other pedal button you can slow down with the car and with the R button the car drive backwards!

In the lower right you can steer the car with the arrow button.

In the lower left you can steer the car with the arrow button.

In the game you can change the view of the camera with a camera button. If the car turns around, you can restore the car to the right side by button.

Hopefully the game will be a lot of fun.

Have fun with Extreme Car Simulator 2020. You can download it for free now!

Show More

What's new in the latest 1

Last updated on Nov 6, 2019
Minor bug fixes and improvements. Install or update to the newest version to check it out!
Show More

Gameplay and Screenshots

  • Extreme Car Simulator 2020 poster
  • Extreme Car Simulator 2020 screenshot 1
  • Extreme Car Simulator 2020 screenshot 2
  • Extreme Car Simulator 2020 screenshot 3
  • Extreme Car Simulator 2020 screenshot 4

Extreme Car Simulator 2020 APK Information

Latest Version
1
Category
Racing
Android OS
Android 4.1+
File Size
97.1 MB
Content Rating
Everyone
Safe & Fast APK Downloads on APKPure
APKPure uses signature verification to ensure virus-free Extreme Car Simulator 2020 APK downloads for you.

Old Versions of Extreme Car Simulator 2020

APKPure icon

Download APKPure App to get more game rewards and discounts

One-click to install XAPK/APK files on Android!

Download APKPure
thank icon
We use cookies and other technologies on this website to enhance your user experience.
By clicking any link on this page you are giving your consent to our Privacy Policy and Cookies Policy.
Learn More about Policies