عن Banana Vs Zombies Forest Trek
مكافحة طريقك من خلال الوحوش والكسالى في هذه المنصة لعبة مغامرة!
Embark on an epic platform adventure as Mr Banana as you trek through the forest and fight against hordes of the undead and monsters only interested in destroying you.
Start your journey in a wonderful forest, jumping and fighting your way through monsters and zombies. Begin your trek for freedom now!
Scavenge banana packs that have scattered around the forest to use as your weapons, or use your strength to jump on the heads of the zombie monsters to kill them once and for all.
Can you stop the undead? Find out as you adventure through the forest and reclaim the land that was once full of joy and peace.
• Reclaim the forest!
• Fight off the zombies with the help of your banana weapons.
• Beautiful scenery.
• Kill the undead zombie monsters!
• An epic adventure trek awaits!
Bananas and more bananas in this crazy world! An epic platform adventure game that is funny and enjoyable to play! So if you like platform games, you'll love our funny take on one!
**** DOWNLOAD NOW ****
So what are you waiting for? Start your trek now and see if you can save Mr Banana!
** We are currently working on some new levels for you to trek through **
If you enjoy playing, please make sure to tell your friends, and show your support with a rating and G+.
Eudokia Apps would like to formally thank Alistair Carvell for composing the outstanding music! We highly recommend him.
http://www.alistaircarvell.co.uk
@AliCarvellSIS
The beautiful Forest Graphics provided by © 2012-2014 Julien Jorge < [email protected] >
What's new in the latest 1.3
First and foremost, we just want to say a HUGE thank you to you guys that download our games, you're all just awesome. Now for the update...
We've just removed the Christmas related things as we feel we've left them in long enough. We're in the process of designing some new levels so keep your eye out for our next update for them. Thanks again everyone.
معلومات Banana Vs Zombies Forest Trek APK
الإصدارات القديمة لـ Banana Vs Zombies Forest Trek
Banana Vs Zombies Forest Trek 1.3
قم بتنزيل تطبيق APKPure للحصول على مزيد من مكافآت الألعاب والتخفيضات
قم بتثبيت ملفات XAPK/APK بنقرة واحدة على أندرويد!






