Beer Pong

Beer Pong

Shellstage
Sep 8, 2018
  • Mature 17+

  • 4.1 and up

    Android OS

Beer Pong 정보

Play your favorite beer pong game anywhere, and anytime you want!

Enjoy your favorite beer pong game anytime or anywhere you want and it's all free!

Features:

1. 2 Beer pong Game mode (Causal, Color)

2. All by your lonesome? Compete with a computer or with your friends (maximum of 2 players per device).

Beer pong rules differs on every house or party events but here’s the rules for this beer pong game.

Interaction Instructions

1. Tap to stop shot selection. Shot selection can be cancelled but be aware from the shot clock. Each player is given 10 seconds to aim.

2. For color mode: A player’s assigned color is signified by the color of the ball or the color of the ‘aim ball’. The aim ball is the circular shape under the end of the arc of your shot selection.

Base Game Instructions

1. A player will be randomly selected to throw the ball first at the start of the game.

2. If the player successfully put the ball into the cup. It will signify as a goal and the player will retain his possession until he misses or cleared all of his cups. The goaled cup is to be removed out of the play.

3. If the player cleared all of his cups, the game will enter rebuttal or redemption phase. On this phase, the opposing player will have the chance to clear all of his cups. If the player misses, the player who first cleared his cups or the player who triggered the rebuttal phase wins. However, if the rebutall-ing player successfully cleared all of his cups. The game will enter overtime phase. During this phase, the cups will be reduced to half. This rule applies also during the overtime period. Both sides have an unlimited amount of rebuttals during overtime until one party has missed.

4. Each player has an opportunity to re-rack (reposition to a triangular formation) when their cup count is at 6-3-1.

5. Bounce shot will amount to two cups cleared.

Color Mode Guide

1. The player must hit the cup with his assigned color. A player’s assigned color is signified by the color of the ball or the color of the ‘aim ball’. The aim ball is the circular shape under the end of the arc of your shot selection.

2. If the player hit a cup that doesn’t belong to him. It will be against him and will be marked as a score/cleared cup for his opponent.

3. Bounce shot still applies and two cups of the same color will be cleared/ removed from play.

Aiming Tip:

Make sure that the cup is between endpoint of the ark and the aim ball for better shot result.

Feel free to comment and rate for further feedback to improve the game experience!

더 보기

What's new in the latest 0.2

Last updated on Sep 8, 2018
Minor bug fixes and improvements. Install or update to the newest version to check it out!
더 보기

게임 플레이 및 스크린 샷

  • Beer Pong의 안드로이드 공식 트레일러
  • Beer Pong 스크린샷 1
  • Beer Pong 스크린샷 2
  • Beer Pong 스크린샷 3
  • Beer Pong 스크린샷 4

Beer Pong apk 정보

최신 버전
0.2
카테고리
아케이드
Android OS
4.1 and up+
개발자
Shellstage
콘텐츠 등급
Mature 17+ · Use of Alcohol
APKPure에서 안전하고 빠른 APK 다운로드
APKPure는 바이러스 없는 Beer Pong APK 다운로드를 위해 서명 확인을 사용합니다.
APKPure 아이콘

더 많은 게임 보상 및 할인을 받으려면 APKPure 앱을 다운로드하세요

한번의클릭으로 Android에 XAPK/APK 파일을설치할수있습니다!

다운로드 APKPure
thank icon
사용자 환경을 개선하기 위해 이 웹 사이트의 쿠키 및 기타 기술을 사용합니다.
이 페이지의 링크를 클릭하면 당사의 개인 정보 보호 정책쿠키 정책에 동의하는 것입니다.
더 알아보기