Updated on Apr 7, 2025
Added:
- The menu entry Tech Tips has been added to the main menu.
- Battery backup can now be configured during commissioning of a plant with backup capabilities.
Changed:
- The configuration of grid settings during commissioning has been improved. In addition to a grid connection rule for the complete system, a grid connection record can be configured for each inverter.
- Error handling during commissioning has been improved.
Fixed:
- Smaller bug fixes and optimizations.