29 CFR 1926 - Subpart P
About 29 CFR 1926 - Subpart P
OSHA Construction Subpart P - Excavations
29 CFR 1926 – OSHA Construction
Subpart P - Excavations
Data is current as of September 1, 2020
For future updates please install our OSHA Construction App:
https://play.google.com/store/apps/details?id=com.regpub.osha.construction
Table of Contents:
§1926.650 - Scope, application, and definitions applicable to this subpart.
§1926.651 - Specific excavation requirements.
§1926.652 - Requirements for protective systems.
Appendix A to Subpart P of Part 1926 - Soil Classification
Appendix B to Subpart P of Part 1926 - Sloping and Benching
Appendix C to Subpart P of Part 1926 - Timber Shoring for Trenches
Appendix D to Subpart P of Part 1926 - Aluminum Hydraulic Shoring for Trenches
Appendix E to Subpart P of Part 1926 - Alternatives to Timber Shoring
Appendix F to Subpart P of Part 1926 - Selection of Protective Systems
What's new in the latest 4.20.08
For future updates please install our OSHA Construction App:
https://play.google.com/store/apps/details?id=com.regpub.osha.construction
29 CFR 1926 - Subpart P APK Information
Old Versions of 29 CFR 1926 - Subpart P
29 CFR 1926 - Subpart P 4.20.08
29 CFR 1926 - Subpart P 3.1.1
29 CFR 1926 - Subpart P 3.0.1
29 CFR 1926 - Subpart P 1.1.5
Super Fast and Safe Downloading via APKPure App
One-click to install XAPK/APK files on Android!