WPS App Connect
10.0
6 Reviews
6.4 MB
File Size
Everyone
Android 4.4+
Android OS
About WPS App Connect
WPS WPA2 App Wifi check the security of your Wifi network using WPS protocol
WPS WPA2 Connect Wifi checks the security of your network using WPS protocol.
It is a utility which helps you detect the potential risk of the WiFi, which include password risk and WPS risk. & also helps in making it More Secure
This protocol allows you to connect to a WiFi network using an 8-digit pin number that usually is predefined in the router,
This app uses these pins to try the connection and check if the network is vulnerable. It implements several known algorithms for pin generation and some default pins. It also allows you to view WiFi passwords stored on the device.
NOTICE: APPLICATION IS MADE FOR EDUCATION PURPOSE ONLY, I AM NOT RESPONSIBLE FOR ANY MISUSE, INTRUSION INTO FOREIGN NETWORKS IS PUNISHABLE BY LAW.
From Android 6 (Marshmallow) it is necessary to grant location permissions. It is a new requirement added by Google in this version. More information in: https://developer.android.com/about/versions/marshmallow/android-6.0-changes.html#behavior-hardware-id
What's new in the latest 3.6.4.20
WPS App Connect APK Information
Old Versions of WPS App Connect
Super Fast and Safe Downloading via APKPure App
One-click to install XAPK/APK files on Android!




