About IPF GL Points
IPF GL points calculator for calculating points across different weightclasses.
The IPF GL Points Calculator is based on the new IPF GL formula for comparing relative strength across different bodyweights.
This is a handy tool for coaches to use during a powerlifting meet or in preparation for a meet for their athletes. Easy and intuitive design for quick calculations.
EASY TO USE
Easily switch between modes with a simple tap in the app "Male/Female", "Powerlifting/Bench" and "Classic/Equipped". The app recalculates the points on the fly!
THREE DIFFERENT MODES
- IPF GL Points: Enter bodyweight and total/exercises and the points will show. It will also show a reference to DOTS and Wilks (can be turned off).
- Target: Enter bodyweight and desired IPF GL point, the app tells you how much you need to lift to reach that IPF GL point. Include option to round to nearest 2.5.
- Meet mode: Compare yourself or others with other lifters, shows needed weight for first place. Filter lifters on IPF GL points, DOTS or Wilks.
INTERNATIONAL
- Both kilo (kg) and lbs (pounds) are supported.
Feel free to rate the app, feedbacks are welcome!
Have fun and stay strong, good luck!
What's new in the latest 1.3.2
- Added confirm dialog on delete lifter
- Bugfixes
IPF GL Points APK Information
Old Versions of IPF GL Points
Super Fast and Safe Downloading via APKPure App
One-click to install XAPK/APK files on Android!






