R&Go

R&Go

RENAULT SAS
Jul 24, 2025
  • 8.0

    1 Reviews

  • 112.8 MB

    File Size

  • 0/67
    Security
  • Everyone

  • Android 6.0+

    Android OS

About R&Go

R&Go only works with Twingo , Master, Trafic, New Clio, New Captur, Kangoo.

Compatibility: this application works on Twingo, New Clio, New Captur, New Trafic, New Master and Kangoo models fitted with the Connect R&Go media system.

With R&Go, you can easily use your smartphone while driving

R&Go is a highly practical, smart application designed to perfectly integrate with your Renault vehicle. Its user-friendly interface helps you to discover a new way of using your smartphone/tablet with your Renault, and to access all the functions of your phone and vehicle in an ergonomic and intuitive way!

All your communication in your vehicle:

- Customisable interface: customize your interface with the shortcut pages and widgets available to you. You have access to the full universe of your smartphone within your R&Go application. Mix information you want to display on your welcome page - GPS, music, rev counter, radio etc. Turn your phone or tablet into a second dashboard and take to the road serenely!

Navigation: select your navigator and navigate accurately using the app of your choice*** to guide you to your destination. The new shortcut pages allow you easier access to your favourite navigation applications on your phone.

Phone: place and receive calls easily while driving. Just received a text message? No problem, the SMS-to-Speech* function reads the message out loud and you keep your eyes on the road, for full safety!

- Vehicle: your vehicle on your smartphone/tablet: R&Go is integrated ** into your vehicle via Bluetooth. Follow the information on the on-board computer from your smartphone/tablet and use the Renault Driving ECO2 functions to drive economically.

- Media: listen to the music you like amongst thousands of web radio stations, music on your phone, a USB flash drive or the vehicle radio.

R&Go must only be used in respect of highway regulations and conditions.

NOTES:

- Continued use of the GPS function can considerable reduce the battery life of your mobile device. Use the Renault cradle (supplied depending on the vehicle) to recharge it while driving.

- Access to social networks, search engines and internet radio requires a mobile internet connection.

- For more details about our personal data protection policy, please visit the Renault website.

* SMS and SMS-to-Speech are only available on Android

** R&Go/vehicle connection is only available on Renault vehicles equipped with an R&Go Connect radio

*** list limited on iOS

Show More

What's new in the latest 3.6.1

Last updated on 2025-07-24
R&Go is continually improving to make your driving experience even more enjoyable
Show More

Videos and Screenshots

  • R&Go poster
  • R&Go screenshot 1
  • R&Go screenshot 2
  • R&Go screenshot 3
  • R&Go screenshot 4
  • R&Go screenshot 5
  • R&Go screenshot 6

R&Go APK Information

Latest Version
3.6.1
Android OS
Android 6.0+
File Size
112.8 MB
Developer
RENAULT SAS
Available on
Content Rating
Everyone
Security Report
0/67
Scan Result: Secure
No security vendors flagged this file as malicious
No Virus
No Spyware
No Malware
No Virus
No Spyware
No Malware
Scan Date:Dec 5, 2025
Package Name:com.renault.roadcompanion
SHA-256:27efc628d3231fdaf80cdc1d7569b12a4208bf2438cce792b78cbfbb2e6b5946
SHA-1:985d567d1b82ee2453e895929d977cdc3cf45c52
Show More

Old Versions of R&Go

112.8 MBJul 24, 2025
Download
112.6 MBDec 5, 2024
Download
15.1 MBFeb 29, 2024
Download
14.8 MBJan 14, 2022
Download
APKPure icon

Super Fast and Safe Downloading via APKPure App

One-click to install XAPK/APK files on Android!

Download APKPure
thank icon
We use cookies and other technologies on this website to enhance your user experience.
By clicking any link on this page you are giving your consent to our Privacy Policy and Cookies Policy.
Learn More about Policies