IntelliTrac Driver App

IntelliTrac Driver App

Virtualmap
Oct 1, 2026
  • 57.9 MB

    File Size

  • Security
  • Everyone

  • Android 6.0+

    Android OS

About IntelliTrac Driver App

Driver app for vehicle check-in, pre-start checks, trips, and fleet updates.

IntelliTrac Driver App helps drivers manage daily fleet operations from their mobile device or in-vehicle tablet.

The app supports the driver workflow from vehicle allocation through to daily checks, trip activity, communication, and data synchronisation with the fleet system.

Key features:

- Driver login and vehicle check-in/check-out

- Vehicle allocation and driver confirmation

- Driver and vehicle pre-start checklists

- FBT trip recording

- Fatigue management and work/rest history

- Odometer entry

- Messaging between drivers and fleet users

- Map and location support

- Vehicle condition reporting

- Offline local data storage with sync when connection is available

This app is intended for registered drivers and fleet operators using the supported IntelliTrac/Hawk fleet platform. Access requires valid company configuration and driver credentials.

Show More

What's new in the latest 7.1.0

Last updated on 2026-10-01
- Leaving a vehicle: "Log Out Of This Vehicle" now shows that it is working, so drivers no longer tap it again while waiting. If it fails, a short message explains it.
- Continue Trip: the button now shows that it is saving and ignores extra taps, so a trip is no longer saved twice or the wrong screen closed.
- Shift bar matches the fatigue card: a driver resting before their first work of the day now sees that rest in the shift bar, instead of it looking empty.
Show More

Videos and Screenshots

  • IntelliTrac Driver App poster
  • IntelliTrac Driver App screenshot 1
  • IntelliTrac Driver App screenshot 2
  • IntelliTrac Driver App screenshot 3
  • IntelliTrac Driver App screenshot 4
  • IntelliTrac Driver App screenshot 5
  • IntelliTrac Driver App screenshot 6

IntelliTrac Driver App APK Information

Latest Version
7.1.0
Category
Productivity
Android OS
Android 6.0+
File Size
57.9 MB
Developer
Virtualmap
Available on
Content Rating
Everyone
Security Report
Check Now
Security Check Completed
No Virus
No Spyware
No Malware
No Virus
No Spyware
No Malware
Package Name:com.intimap.driver_app_ft
SHA-256:81d5c086a341cd6f52b6245f5d67cae94a97bd022bfa31377aa5936379a0d8bb
SHA-1:13b8fb143870f1d4455548318492ad881573e0b8
Show More
Verified by: APKPURE

Old Versions of IntelliTrac Driver App

APKPure icon

Super Fast and Safe Downloading via APKPure App

One-click to install XAPK/APK files on Android!

Download APKPure
thank icon
We use cookies and other technologies on this website to enhance your user experience.
By clicking any link on this page you are giving your consent to our Privacy Policy and Cookies Policy.
Learn More about Policies